Proper cable dressing to be ensure and camber cover to be closed
29 Mar 2017
28 Feb 2017
Detail trouble shooting chart to be prepred
Wrt power source and NA5 to be detail trouble shooting chart to be prepared and discussed
Niraj to take lead
Abnormal noice observed above vtl
Abnormal sound observed when 50 t inside crane moves above vtl
25 Feb 2017
VTL- Issue observed during PM -23-2-2017
- Ram balancing cylinder Cross rail - slight leakage observed - To be kept under obsrvation and concluded- vaibhav
- Main power on /off switch not working Ok- New lever to be searched and installed- Satish/Niraj
- Handwheel e-switch to be replaced - Satish
20 Feb 2017
Diesel drum kept outside
Pm check list if transformer and avr
Niraj please make check list for both transformer and aur, get it sign off and carry out pm as per same .
Hydro storage tank - water leaking
Lifting trolly - P9-in bad shape
Three roll bending
Flat stud welding machine- pressure switch
Behringer cutting machine
Pema inlet cable dressinng
Strip shot blasting
Pipe shot blasting - cable dressing
Pipe shot blasting - poka yoke for rotor jamming issue
Pema welder
Pema- temperature adj. Nob
Pema - opl for repairing flex recovering
Vaibhav as discussed please prepare opl, for cleaning flex recovery cylinder and explain to operator and line engineer
Pema incident creating point not cleared
Pipe was required to be cut as per actual requirement, and provision for rounding off was required to be done as explained to alpesh
SF cooling system details study
detail technical back up to be attached.
Target date-25-2-2017
Stbw gear box to be repaired
Either to be repaired or searched spare
Find root casue of bush failure of serrator unit gearbox
18 Feb 2017
Jurastic y axis breaking issue
All b&h toilet to be white washed
As per admin confirmation all toilet need to be painted
Amit pl ensure
Crane gear box oil to be replaced
Do oil testing of crane gear box and take decision of replacement
Of coil shop and panel shop crane
Td - 21-2-2017
Install emergency hooter at admin
I install emergancy hooter at admin
Hooter reached , cable awaited., Cable expected to reach by Monday.
Work needs to be completed by 22-2-207
17 Feb 2017
16 Feb 2017
Maintenance Register & communciation
Use this system to register pending work , view & edit pending works and also to communicate between us .
Currently you can view my communication , in due course you can start communication too.
But please use this system to register pending work and update pending work.
regards
Ajay Gupta