Detail trouble shooting chart to be prepred
Wrt power source and NA5 to be detail trouble shooting chart to be prepared and discussed
Niraj to take lead
20 Feb 2017
Lifting trolly - P9-in bad shape
Flat stud welding machine- pressure switch
Pema inlet cable dressinng
Pipe shot blasting - cable dressing
Pipe shot blasting - poka yoke for rotor jamming issue
Location/ Resposibility
alpesh,
panel shop,
satish,
vaibhav
Pema welder
Pema- temperature adj. Nob
Pema incident creating point not cleared
Pipe was required to be cut as per actual requirement, and provision for rounding off was required to be done as explained to alpesh
18 Feb 2017
Install emergency hooter at admin
I install emergancy hooter at admin
Hooter reached , cable awaited., Cable expected to reach by Monday.
Work needs to be completed by 22-2-207