Detail study to be done and guideline to run chiller to be prepared and display on machine .
detail technical back up to be attached.
Target date-25-2-2017
detail technical back up to be attached.
Target date-25-2-2017
Do oil testing of crane gear box and take decision of replacement
Of coil shop and panel shop crane
Td - 21-2-2017