Why finishing still not ok
What are we doing to break extention
Showing posts with label amit. Show all posts
Showing posts with label amit. Show all posts
20 Feb 2017
18 Feb 2017
All b&h toilet to be white washed
As per admin confirmation all toilet need to be painted
Amit pl ensure
Install emergency hooter at admin
I install emergancy hooter at admin
Hooter reached , cable awaited., Cable expected to reach by Monday.
Work needs to be completed by 22-2-207
17 Feb 2017
Subscribe to:
Posts (Atom)